Skip to main content

Location

Research Support Building (CACTUS). Lugo
Campus Lugo s/n, 27002
Lugo
Schedule
Monday to Friday, from 10 a.m. to 2 p.m. and from 4 p.m. to 6 p.m.
  • Operational equipment
The main components of the ICP-OES are the spectrometer (polychromator with a CCD solid state detector) and the plasma source (40 MHz RF generator).